Project Address: 27-37 Jellicoe Street, Toowoomba QLD 4350
Client: McNab
Scope of Works:
- 65+m Flat Top Steel Balustrade (1m high)
- All Posts Set with Chemical Anchors
- Custom Raked Panels (to suit the stairs)
- 1 x 6m Automated Slide Gate (1.8m high)
- Industrial Gate Motor
- Safety Sensors (included on all automated gates)
- Remote Control Access
- 2 x Keypads for Access Control
- 365-Day Timer
Project Overview:
At Boyce Gardens carpark in Toowoomba, McNab needed a security and access solution combining a long balustrade run with a fully automated vehicle entry. Jagfence supplied and installed over 65 metres of flat-top steel balustrade, engineered to Form 15 certification standards. A custom raked panel was built to follow the line of the stairs, with all posts secured using chemical anchors for a strong, long-lasting fix. Every component was manufactured in-house at our warehouse and finished in a custom Woodland Grey powder coat for a clean, consistent look across the site.
Vehicle access is controlled via a 6-metre automated slide gate, fitted with an industrial-grade motor and safety sensors. Entry is available by remote control or one of two keypads. An additional access control stand was installed to make the keypad easier to reach on entry. The gate also runs on a 365-day timer, letting the client schedule automatic opening and closing, restrict access outside business hours, and set one-off closures for holidays or Christmas shutdown. Unlike a standard weekly timer, the 365-day function tracks the full calendar year, giving the client greater flexibility over site access.
