Project Address: 1/9 Logistics Drive, Charlton QLD 4350
Client: GFG Projects
Scope of Works:
- 225m Spearmaster frontage fencing
- 525m chainwire fencing
- 1 x 19.5m Automated Spearmaster Sliding Track Gate
- 1 x 13m Automated Spearmaster Sliding Track Gate
- 1 x 12m Automated Spearmaster Sliding Track Gate
- 1 x 6.5m Automated Spearmaster Sliding Track Gate
- Industrial Gate Motors
- Safety Sensors (included on all automated gates)
- Remote Control Access
- Spearmaster Personal Access Gate
- Internal Chainwire Divider Fence (installed on top of existing wall)
Project Overview:
Heavy daily vehicle movement was the key driver behind the fencing and gate solution installed at this Hillman's Transport warehouse in Charlton, QLD. Four automated Spearmaster sliding gates were designed, manufactured and installed, the largest spanning nearly 20 metres, giving the site efficient, reliable traffic management without compromising on build quality. Each gate was fitted with an industrial motor and safety sensors, with remote control access for ease of use. Spearmaster fencing across the frontage lifted the property's street presentation while also strengthening security and functionality. Matching personal access gate was added for pedestrian entry. Chainwire fencing was used extensively around the site's perimeter, complemented by an internal chainwire divider fence built on top of an existing wall, ranging from 3m to 5.45m in height. This internal barrier included all necessary framing and support posts, with the top raked to follow the angle of the roof rafters. The work was completed under working at heights permits to ensure all safety requirements were met.